• TSX-V:ECR 0.11 (-0.01)
  • Volume 194626

Press releases



April 15, 2014

Cartier Discovers Extension of Pusticamica Deposit at Depth

Val-d’Or, April 15th, 2014 – Cartier Resources Inc. (TSX-V: ECR) (“Cartier”) announces recent results from its 2014 winter diamond drill program (Table below) which when factored with the 10.3 g/t Au over 5.0 m intersection included within an interval grading 2.4 g/t Au over 53.0 m in hole Pu-14-09 (February 27th, 2014 press release) confirm the extension of the gold-bearing system down to a depth of 650 m below the Pusticamica deposit  All of the diamond drill holes completed in the winter 2014 program intersected the gold-bearing Pusticamica zone and show characteristics (mineralisation, alteration and texture) typically observed in important mineralised systems.

“The continuity of the gold-bearing Pusticamica system at depth factored with the potential for increasing the historical resource warranted the acquisition of the Murgor royalty as announced last week and testifies to the confidence we have in the future potential for the Benoist project” ,concludesPhilippe Cloutier, President and CEO.

The Benoist property is 65 km northeast of the town of Lebel-sur-Quévillon, 25 km south-east of the Bachelor mine and 25 km north-west of the Langlois mine.

Table of recent results
Drill Hole   RESULTS
 

PU-14-11C

7.4  g/t Au / 1.0 m incl. within 2.5 g/t Au / 4.0 m incl. within 0.5 g/t Au / 89.0 m
PU-14-12 5.6  g/t Au / 2.0 m incl. within 3.2 g/t Au / 4.0 m incl. within 0.5 g/t Au / 79.0 m
PU-14-13 7.2  g/t Au / 1.0 m incl. within 0.5 g/t Au / 60.0 m
* Reported intersections are measured along the core axis. The position of the drill holes are illustrated on the figure.

About Cartier

The company’s objective is to develop and maintain a balanced portfolio of mining projects ranging from exploration to resource definition, development and production.  Its VISION is to develop the company’s current and future assets into mineral production within a timeframe that is consistent with its human and financial resources while respecting sustainable development practices.

 

Quality Assurance / Quality Control

The scientific and/or technical information presented in this press release has been reviewed and approved by Mr. Gaétan Lavallière, P. Geo., and Vice President for Cartier.  Mr. Lavallière is a qualified person as defined by National Instrument 43-101.

 

–       30 –

 

For more information, please contact:

Philippe Cloutier
President and CEO

Cartier Resources Inc.

Telephone: 819 856-0512
info@ressourcescartier.com
www.ressourcescartier.com

 

Neither the TSX Venture Exchange nor its regulatory services provider accepts responsibility for the adequacy or accuracy of this press release.


Document(s)

April+15th+2014