
Cartier CEO Philippe Cloutier reviews the August 27 2024 news release reporting high-grade gold results from the VG10 Zone at the Chimo Mine Project near Val-d’Or, Quebec. Highlights include 142.2 g/t Au over 0.5 m and 137.4 g/t Au over 0.5 m, confirming strong near-surface potential as drilling expands across the new VG Structure.
A great presentation that you don’t want to miss!
WATCH IT HERE: Cartier Resources Cuts 142.2 g/t Au / 0.5 m in VG10 Zone – Aug 27 News Release Backgrounder
TSXV: ECR | FSE: 6CA
$ECR.v
#Gold #Mining #Exploration #Abitibi
——————————————————————-
About Cartier Resources
Founded in 2006 and based in Val-d’Or, Québec, Cartier Resources is advancing the Cadillac Project, a 15-kilometre land package along the world-class Larder Lake–Cadillac Fault Zone. Recent drilling has outlined 10 gold-bearing zones with grades up to 173.5 g/t gold, all open for expansion. Supported by Agnico Eagle Mines (27%) and major institutions, Cartier is executing a 100,000-metre drill program to advance near-surface systems and new AI-identified discoveries.
HEAD OFFICE
1740, chemin Sullivan, bureau 1000
Val d’Or (Québec) J9P 7H1
T: 819-874-1331
TF: 1-877-874-1331
E: [email protected]
W: ressourcescartier.com
For more information, contact:
Philippe Cloutier, President and CEO

