Cartier intersects up to 16.7 g/t Au over 2.1 m at Contact Zone at the East Cadillac Property – Strengthens shallow high-grade gold potential
Eric Lemieux writes: ‘On September 23, 2025, Ressources Cartier Resources reported first batch drill results from its ongoing fully funded 100,000-m drilling campaign on the Cadillac Project in Abitibi, Québec. Cartier, based in Val-d’Or, is actively advancing the development of its flagship Cadillac Project. The Cadillac Project is comprised of the Chimo Mine and East Cadillac properties, the latter of which was acquired on April 7, 2022. Cartier also holds a portfolio of other projects located within a 200km radius of Val d’Or. New drill results are from Contact Sector and more precisely, the North Contact Zone (NCZ). Currently 2 drill rigs are operating on the 100%-owned Cadillac Project located ~45 km east of the well-endowed Val-d’Or gold mining camp. The Contact Sector is a highly prospective area featuring the NCZ and several newly defined high-priority drill targets.’
– Eric Lemieux, Mining & Exploration Analytics
November 13, 2025
TSXV: ECR | FSE: 6CA
$ECR.v
#Gold #Mining #Exploration #Abitibi
——————————————————————-
About Cartier Resources
Founded in 2006 and based in Val-d’Or, Québec, Cartier Resources is advancing the Cadillac Project, a 15-kilometre land package along the world-class Larder Lake–Cadillac Fault Zone. Recent drilling has outlined 10 gold-bearing zones with grades up to 173.5 g/t gold, all open for expansion. Supported by Agnico Eagle Mines (27%) and major institutions, Cartier is executing a 100,000-metre drill program to advance near-surface systems and new AI-identified discoveries.
HEAD OFFICE
1740, chemin Sullivan, bureau 1000
Val d’Or (Québec) J9P 7H1
T: 819-874-1331
TF: 1-877-874-1331
E: [email protected]
W: ressourcescartier.com
For more information, contact:
Philippe Cloutier, President and CEO


